What to fix before you list, and what to leave alone

Small, visible faults cost sellers more than they cost to fix. Big projects rarely pay back. Here’s how to tell the difference, with typical costs.

7 min read · Updated November 2026

Why small faults matter

Most buyers commission a survey that rates each part of a home 1, 2 or 3. A 3 can stop a sale; a string of 2s is what reopens the price. Mouldy sealant, sticking windows and scuffed woodwork add up to an impression of neglect, and buyers knock off far more than the work would cost.

Start at the pavement

The front of the house is the first photo on every listing and the first thing a viewer sees. In a terrace that usually means the front door, the path and the boundary wall. A repainted door, polished door furniture and a deep-cleaned path take about a day and a half, and change the impression before anyone steps inside.

The hallway sets the tone

Viewers form an opinion in the first few seconds, and in a terrace those seconds happen in a narrow hall. Scuffed walls, chipped spindles and a tired stair carpet are what they see. A hallway, stairs and landing refresh takes around three days, and is one of the most worthwhile jobs on the list.

Period houses: sashes, cracks and damp

Free painted-shut sash windows rather than replacing them: buyers of period houses value the originals, and in some conservation areas you need permission to change them. Fine cracks in old plaster are usually cosmetic; wide, growing or diagonal ones need a professional opinion first. Damp low on a wall is often caused by raised ground, blocked air bricks or a leaking gutter, so deal with the cause and never decorate over it.

What to leave alone

Some jobs rarely pay back before a sale.

  • A dated but working kitchen or bathroom: clean it and fix the snags
  • Fireplaces, cornicing, original doors and tiled floors: repair, don’t replace
  • An older boiler that works: have it serviced and keep the certificate
  • Carpets: clean them; many buyers want to choose their own

The paperwork behind past work

Loft conversions, extensions, removed chimney breasts, replacement windows and rewiring all come with paperwork: building control sign-offs, window and electrical certificates. The buyer’s solicitor will ask for them. Finding them now takes an afternoon; discovering they’re missing after an offer can take weeks.

Conservation areas

Much of London sits in conservation areas, and some councils use Article 4 directions to bring more changes to the front of a house under planning control. In Richmond upon Thames, the council applies them in a number of conservation areas, including Central Richmond, Richmond Riverside and Petersham. Like-for-like repairs are usually fine, but check with your council before changing anything visible from the street.

Common survey flags, and the fix

WHAT THE SURVEYOR NOTESTHE FIX BEFORE LISTINGTYPICAL LABOUR
Sealant or grout failing around the bath or showerRegrout and resealFrom £190
Windows stiff, painted shut or with broken cordsFree the sashes and check cords£190 per two
Worn decoration, chipped woodworkFill, touch up and glossFrom £210
Loose fittings, dripping tapsBathroom or kitchen snag list£190
Trip hazards at doorwaysRe-stretch carpet, fit threshold strips£190
No recent electrical testCondition report from a registered electricianQuoted by them
No boiler service recordService by a Gas Safe registered engineerQuoted by them
High damp readingsFind the cause: gutters, air bricks, raised groundVaries

Typical south-west London labour rates from our price book, before materials.